ENOC 82m Chimney Tower Demolition

ENOC 82m Chimney Tower Demolition — view 1ENOC 82m Chimney Tower Demolition — view 2ENOC 82m Chimney Tower Demolition — view 3ENOC 82m Chimney Tower Demolition — view 4ENOC 82m Chimney Tower Demolition — view 5
SectorInfrastructure
LocationDubai, UAE
Timeline2011
ScopeControlled high-rise demolition of an 82m steel-reinforced concrete chimney tower using a remote-operated spider demolition machine.
Overview

Diamond Edge Cutting was appointed by ENOC to dismantle an 82-metre steel-reinforced concrete chimney tower at Jebel Ali, Dubai, where environmental conditions ruled out conventional methods. A purpose-built spider demolition machine — a Liebherr excavator mounted on a specially engineered six-legged base — was modified in Germany with a radio-based remote control system to allow operation from outside the structure, meeting ENOC's stringent safety requirements. The machine was shipped to Dubai, assembled on-site, and lifted to the top of the tower by a 500-tonne mobile crane. Working downward at roughly 3.5–4m per day, the tower was demolished to 15m above site level, with the remaining section taken down by conventional excavators and breakers — delivered safely and to the client's full satisfaction.

Key Highlights
  • Remote-operated spider demolition machine (Liebherr excavator on a custom six-leg base), engineered and modified in Germany for off-structure operation
  • Radio-based remote control system installed to meet ENOC's high safety standards
  • Machine lifted to the tower top by a 500-tonne mobile crane and operated at height
  • Controlled top-down demolition averaging 3.5–4m per day, completed on programme